We recently undertook the Cat B fit out over 4 floors in the newly constructed Worldpay building situated in the World-renowned Cambridge Science Park.
The fit out covering the ground to 2nd floors, comprised the formation of meeting PODs, bespoke Joinery and collaboration spaces on each floor. As well as a tea point, phone booths and individual meeting rooms. These formed the focal point of the floors with the open space working environment set around them. We also installed a new shower block, with changing rooms and a drying room on the ground floor, along with a post room and IT build room.
The 3rd floor is dedicated to meeting rooms, 8 in total comprising glazed partitions and a new AV set up. A new canteen facility with a fully equipped commercial kitchen and bespoke servery and condiment counters front of house.
- Client Worldpay
- Architect NORR Architects
- Project Manager M&G
- Cost Consultant M&G
- Services Consultant TAP
- Programme 24.5 Weeks
![](/dyn/zkqTB3U682UqIfft5LzNmYRMfEcWh7-FQGc2Capex9s~/crop/width:1400-fit/uploads/components/block/ContentImage-618ce5fc6ce13.jpg)
![](/dyn/cwZl1W_9Ung4ihm_sNjFkAgk4_Xi0Ve_0GLiHNK1iiU~/crop/width:1400-fit/uploads/components/block/ContentImage6-618cea52dfe58.jpg)
![](/dyn/wRicbTKq3VlD54iA5ZvbTTl8FCSwdhLZDKLwMeux0lo~/crop/width:1400-fit/uploads/components/block/ContentImage2-618ce6b9b6527.jpg)
![](/dyn/0KPrcqpiP49mK4ARIAYulaB79ABkVqtDwYvh35BnlL0~/crop/width:1400-fit/uploads/components/block/Image7-618cea2e4d520.jpg)
![](/dyn/LdK-mDcWcMwNyPL-MHJrNQieYFqA5WCHWMqX7pq_JeM~/crop/width:1400-fit/uploads/components/block/ContentImage4-618ce6cca084a.jpg)